TIANJIN SCIENCE & TECHNOLOGY ›› 2023, Vol. 50 ›› Issue (9): 46-49.

• Applied Technology • Previous Articles     Next Articles

Exploration and Practice of Site Assembly Test of Turbine Generator Set

LI Wanjiong, CHEN Fengbo, ZHANG Jin, ZHANG Xuecheng, YIN Jihong   

  1. Tianjin Branch,CNOOC <China> Co.,Ltd.,Tianjin 300459,China
  • Received:2023-09-01 Online:2023-09-25 Published:2023-12-26

Abstract: At the beginning of 2020,affected by COVID-19 infection,the turbine generator set of an oilfield development project could not be delivered normally. In order to shorten the delivery cycle,the idea of conducting assembly tests at the site was proposed. By summarizing and analyzing the technical difficulties in the assembly and testing process of turbine generator sets at the construction site,corresponding measures are proposed,providing a beneficial reference for subsequent projects.

Key words: turbine, generator sets, site assembly, site function test

CLC Number: