TIANJIN SCIENCE & TECHNOLOGY ›› 2025, Vol. 52 ›› Issue (04): 11-14.
• Management & Innovation • Previous Articles Next Articles
XIA Kaixuan
Received:
Online:
Published:
Abstract: Based on the docking repair project of jack-up oil production platforms,the key management elements in the dock repair process are described. The quality supervision and control methods of dock repair construction management are discussed,aiming to provide theoretical support and practical reference for dock repair construction management of offshore oil platforms through measures such as building a quality management system,strengthening safety risk control,optimizing project schedule management,strengthening cost management and benefit analysis.
Key words: oil production platform, dock repair, engineering quality, quality management system, safety management, project schedule, cost management
CLC Number:
TE42
XIA Kaixuan. Quality supervision and control of dock repair management for jack-up oil production platforms[J]. TIANJIN SCIENCE & TECHNOLOGY, 2025, 52(04): 11-14.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://tougao.tisti.ac.cn/EN/
http://tougao.tisti.ac.cn/EN/Y2025/V52/I04/11