TIANJIN SCIENCE & TECHNOLOGY ›› 2025, Vol. 52 ›› Issue (06): 49-52.
• Applied Technology • Previous Articles Next Articles
HOU Hui
Received:
Online:
Published:
Abstract: Aiming at the problems existing in the artificial wellbore sand control process,such as complex working fluid systems,complicated procedures,and large construction scales,a secondary sand control process using low-temperature consolidated coated and forced induced sand removal is proposed. In the well X2 of a certain oilfield in Bohai Sea,the cumulative pumping volume of consolidated ceramsite and working fluid was reduced by 50% and 70% respectively compared with the conventional process,the 24-hour post-drill-out heating time was saved,and there was no sand production after production. This process can effectively improve the operation efficiency and reduce the construction cost. One-time construction can achieve the dual effects of production increase and sand control,and it has broad application prospects in deep-layer oil and gas development and the transformation of low-production and low-efficiency wells.
Key words: secondary sand control process, reservoir transformation, low-temperature consolidated coated ceramsite, forced induced sand removal
CLC Number:
TE53
HOU Hui. Innovation and application of secondary sand control process for artificial wellbore in screen-damaged wells[J]. TIANJIN SCIENCE & TECHNOLOGY, 2025, 52(06): 49-52.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://tougao.tisti.ac.cn/EN/
http://tougao.tisti.ac.cn/EN/Y2025/V52/I06/49