TIANJIN SCIENCE & TECHNOLOGY ›› 2023, Vol. 50 ›› Issue (Z): 52-56.
• Applied Technology • Previous Articles Next Articles
MENG Fanba, LI Pei
Received:
Online:
Published:
Abstract: The offshore booster station is the heart of offshore wind farms,and its importance to the entire wind farm is self-evident. The booster station should have a “turnkey” engineering status during the land construction phase. The scientific and reasonable basic strategy of the land construction unit regarding the overall layout and segmented division during the construction of the offshore booster station has a significant impact on the convenience and cost of its later construction. Based on the practical experience in the construction of booster stations,a detailed process study is conducted on the overall layout (orientation and layout height),segmented division,and layout of segmented construction during the land construction phase of the booster station. Overall process considerations for the layout of the booster station can meet the requirements of the construction cycle and site,and also provide technical support for shortening the construction cycle and controlling construction costs.
Key words: offshore booster station, construction arrangement, type of shipping, segmented division, segmented construction
CLC Number:
U663.31
MENG Fanba, LI Pei. Research on Segmented Construction Layout and Construction Technology of Offshore Wind Power Booster Stations[J]. TIANJIN SCIENCE & TECHNOLOGY, 2023, 50(Z): 52-56.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://tougao.tisti.ac.cn/EN/
http://tougao.tisti.ac.cn/EN/Y2023/V50/IZ/52