Abstract: Taking a LNG floating transfer barge design scheme as an example,based on HAZID,the layout of LNG floating transfer barge design scheme and equipment,towing operation,preparation before transfer operation and LNG transfer operation are identified,the risk level is evaluated and the corresponding risk control measures are formulated. The causes,consequences,existing protective measures,risk level and countermeasures of hazards caused by factors such as design layout,process flow,equipment failure and human operation of LNG floating transfer barge design scheme are analyzed.
Key words: HAZID, LNG floating transfer barge, LNG transfer operation, risk assessment
CLC Number:
U674.13
WANG Ying. Risk Assessment of LNG Floating Transfer Barge Design Scheme Based on HAZID[J]. TIANJIN SCIENCE & TECHNOLOGY, 2023, 50(4): 18-21.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://tougao.tisti.ac.cn/EN/
http://tougao.tisti.ac.cn/EN/Y2023/V50/I4/18