天津科技 ›› 2025, Vol. 52 ›› Issue (01): 87-89.

• 应用技术 • 上一篇    下一篇

山区高铁超前地质预报应用中存在的问题与解决思路

魏来   

  1. 中国铁路设计集团有限公司 天津 300251
  • 收稿日期:2025-01-02 出版日期:2025-01-25 发布日期:2026-01-06
  • 基金资助:
    中国铁路设计集团有限公司科技开发课题项目“基于图像处理技术的铁路隧道掌子面岩体完整程度自动判别研究”(2024B0103000006)

Problems and solutions in application of advanced geological prediction for high-speed railway in mountainous areas

WEI Lai   

  1. China Railway Design Corporation, Tianjin 300251, China
  • Received:2025-01-02 Online:2025-01-25 Published:2026-01-06

摘要: 隧道超前地质预报已应用于铁路建设多年,受重视程度逐年提升。通过研究复杂山区某长大干线高速铁路建设期间隧道超前地质预报实施情况,从方案、组织管理、专业分工和实施效果诸多方面分析实施过程中存在的问题,针对性提出解决思路和措施,具有应用推广价值。

关键词: 高速铁路, 超前地质预报, 施工管理, 隧道施工

Abstract: Advanced geological prediction of tunnels has been applied to railway construction for many years,and the degree of attention has been increasing year by year. By studying the implementation of advanced geological prediction of tunnels during the construction of high-speed railway in a complex mountainous area,this paper analyzes the problems existing in the implementation of advanced geological prediction of tunnels for high-speed railway from many aspects,such as advanced geological prediction scheme,organization and management,professional division of labor and implementation effect. Targeted solutions and measures are proposed,which have reference for application and promotion.

Key words: high-speed railway, advanced geological prediction, construction management, tunnel construction

中图分类号: