摘要: 燃气工程是城市能源建设的基础性工程,其管道施工安全尤为重要。只有掌握恰当的进场施工时间节点,才能极大保障后续施工的安全可靠性。通过对目前民用燃气工程的进场施工时间节点进行调查,分析施工过程中存在的实际问题,探讨改进措施,以期为今后民用燃气工程施工提供理论依据和实践指导。

关键词: 民用燃气工程, 施工时间节点, 改进措施

Abstract: Gas engineering is a fundamental project in urban energy construction,and the safety of pipeline construction is particularly important. Only by mastering the appropriate time node can the safety and reliability of subsequent construction be greatly guaranteed. This article investigates the current entry construction time nodes of civil gas engineering,analyzes problems existing in the construction process,and discusses improvement measures,in order to provide theoretical basis and practical guidance for future civil gas engineering construction.

Key words: civil gas engineering, construction time nodes, improvement measure