天津科技 ›› 2025, Vol. 52 ›› Issue (10): 40-42.

• 应用技术 • 上一篇    下一篇

某海上气田提高开发井投产时效的技术措施及实施效果

郑武, 周大伟   

  1. 中海石油(中国)有限公司天津分公司渤西作业公司 天津 300457
  • 收稿日期:2025-09-05 出版日期:2025-10-25 发布日期:2026-01-06

Technical measures to improve time efficiency of development well commissioning in an offshore gas field

ZHENG Wu, ZHOU Dawei   

  1. Boxi Operating Company of Tianjin Branch,CNOOC <China> Co.,Ltd.,Tianjin 300457,China
  • Received:2025-09-05 Online:2025-10-25 Published:2026-01-06

摘要: 某气田开发项目无人井口平台共有65口开发井,从管线设计到施工安装井口流程配管工作量巨大;人员需要乘船穿梭于住宿地与施工地,且受限于在船人员(POB)数量及船舶资源紧张,无法有效保证施工进度;连接配管与采气树时,无施工参考定位,需要待采气树安装完成后进行配管连接,造成完井至开井有一定滞后性,完井后不能及时投产。针对影响开发井投产时效性的因素与问题,开展头脑风暴、方案研究,采取一系列技术措施,以提高开发井投产时效。

关键词: 采气树模型, 配管布局, 开井, 产量

Abstract: In a gas field development project,an unmanned wellhead platform with a total of 65 development wells was deployed. The piping design and construction for the wellhead surface process involved a massive workload. Personnel had to commute by boat between living quarters and the construction site,and due to constraints such as limited pilot on board and scarce vessel resources,construction progress could not be reliably ensured. During the piping installation and connection to the gas Christmas trees,the absence of reference positioning benchmarks required delaying piping connections until after the Christmas trees were fully installed. This resulted in a lag between well completion and well commissioning,and the well cannot be put into production in a timely manner after completion. To address the factors and issues affecting the time efficiency of development well commissioning,brainstorming sessions and solution studies have been conducted,and a series of technical measures have been adopted to improve the time efficiency of development well commissioning.

Key words: gas Christmas tree model, piping layout, well commissioning, production rate